The team has been busy constructing timber boardwalks, retaining walls, and root bridges for tree protection along the route. The works have included the construction of a 3.65km 2.5m wide at-grade concrete footpath; 8 no. 2.5-3m wide elevated timber boardwalks totalling over 630lm; a 14m span 630x135m gluman bridge across a tidal stream and various minor storm water crossings.