We provided skilled teams to assist in the delivery and erection on site in the ferry basin of three canopy structures. Each canopy was constructed in three pieces (nine pieces in total) and transported separately from Hobsonville by barge to downtown Auckland and installed in place on site. Each canopy piece had to be unloaded from the barge by crane and transferred to a second crane to land in the final design location on site.