Built causeway and staging alongside outfall pipeline
Connected all pump stations with services
Fitted mechanicals in pump stations
Controlled environment
EF and butt-welding PE pipe
Working with local Iwi and archeologists
The construction of new wetlands and ponds to the existing Blenheim sewerage treatment plant, plus the construction of a new 1200mm diameter polyethylene Wairau estuary outfall pipeline and outfall pump station.